Skip to main content
Childery

Bland April

Data last updated · May 2026

Quality Indicators

See Methodology →
  • Overall Quality
    3 / 5
  • Process Quality
    3 / 5
  • Structural Quality
    2 / 5

Why this rating

This daycare earned 3 out of 5 stars overall. Process quality reflects a Quality Rated rating of Level 3. Structural quality reflects Georgia's licensing baseline. Georgia caps infant ratios at 1:6, toddler ratios at 1:8, and preschool ratios at 1:18. Lead teachers must hold a Child Development Associate (CDA). Teachers must complete 10 hours of annual training.

Quality Recognitions & Accreditations

State Quality Rating
Quality Rated Level 3 (Max 3) Learn more →
Accreditations
  • National Association for the Education of Young Children (NAEYC)Not Accredited
  • National Accreditation Commission (NAC)Not Accredited
  • National Early Childhood Program Accreditation (NECPA)Not Accredited
  • National Association for Family Child Care (NAFCC)Not Accredited

Facility Info

Facility type
Family Child Care Home
Age groups served
Toddlers, Preschool
Licensed capacity
6
Teacher-child ratios & group sizesState Minimum Displayed
AgeMax ratioMax group
Toddlers1:816
Preschool1:1836

Teacher Credentials

Lead teacher credentialState Minimum Displayed
Child Development Associate (CDA)

Inspection History

1 Inspection Visit Since 2026 · 1 Finding
1 Important

Across 1 inspection since 2026, the issues cited most often were Building & Premises Safety (1). The single finding was not critical.

See the Inspection Visit
  1. May 14, 20261 Finding1 Important
    • 290-2-3-.13(2)(a) Requires That Outdoor Play Areas Be Kept Clean and Free of Hazards Such as Exposed Sharp Corners Of…290-2-3-.13

      290-2-3-.13(2)(a) requires that outdoor play areas be kept clean and free of hazards such as exposed sharp corners of concrete or equipment, rust and splinters on equipment, broken glass, open drainage ditches, holes and stagnant water. It was determined based on observation that the following hazards were observed: - Four exposed screws located on the exterior of the building. - Two rusted expose