Skip to main content
Childery

Cobb Jewish Preschool

Data last updated · May 2026

Quality Indicators

See Methodology →
  • Overall Quality
    2 / 5
  • Process Quality
    Not Available
  • Structural Quality
    2 / 5

Why this rating

This daycare earned 2 out of 5 stars overall. Structural quality reflects Georgia's licensing baseline. Georgia caps infant ratios at 1:6, toddler ratios at 1:8, and preschool ratios at 1:18. Lead teachers must hold a Child Development Associate (CDA). Teachers must complete 10 hours of annual training. No objective process measures (e.g., state quality rating or national accreditation) are available for this daycare. The overall rating reflects structural features only.

Quality Recognitions & Accreditations

Accreditations
  • National Association for the Education of Young Children (NAEYC)Not Accredited
  • National Accreditation Commission (NAC)Not Accredited
  • National Early Childhood Program Accreditation (NECPA)Not Accredited
  • National Association for Family Child Care (NAFCC)Not Accredited

Facility Info

Facility type
Child Care Center
Age groups served
Toddlers, Preschool, School-Age
Licensed capacity
81
Teacher-child ratios & group sizesState Minimum Displayed
AgeMax ratioMax group
Toddlers1:816
Preschool1:1836

Teacher Credentials

Lead teacher credentialState Minimum Displayed
Child Development Associate (CDA)

Inspection History

2 Inspection Visits Since 2025 · 2 Findings
2 Important

Across 2 inspections since 2025, the issues cited most often were Building & Premises Safety (1) and Emergency Preparedness & Drills (1). None of the 2 findings were critical.

See All 2 Inspection Visits
  1. Feb 19, 20261 Finding1 Important
    • 591-1-1-.26(8) Requires Climbing and Swinging Equipment to Have a Resilient Surface Beneath the Equipment and the Fall…591-1-1-.26

      591-1-1-.26(8) requires climbing and swinging equipment to have a resilient surface beneath the equipment and the fall zone from such equipment must be adequately maintained by the Center to assure continuing resiliency. It was determined based on observation, less than 2 inches of mulch was observed under the fall zones on this date, when 5 inches is required.

  2. Apr 3, 20251 Finding1 Important
    • 591-1-1-.21(3) Requires That the Center Conduct Drills for Fire, Tornado and Other Emergency Situations591-1-1-.21

      591-1-1-.21(3) requires that the Center conduct drills for fire, tornado and other emergency situations. The fire drills will be conducted monthly and tornado and other emergency situation drills will be conducted every six months. The Center shall maintain documentation of the dates and times of these drills for two years. It was determined based on review of documents, the center has not complet