Georgia Chaffee Teenage Parent Program Co-Op CDC
Data last updated · May 2026
Quality Indicators
See Methodology →- Overall QualityCombines daily care quality (interactions, learning, environment) with structural features like staff-to-child ratios and teacher qualifications.4 / 5
- Process QualityThe quality of daily care — caregiver-child interactions, learning activities, and the emotional climate. Drawn from the state QRIS rating, accreditations, and Head Start CLASS observations.5 / 5
- Structural QualityMeasurable features like staff-to-child ratios, group sizes, license status, and teacher qualifications. Provider-level data when available; otherwise the state regulatory baseline.3 / 5
Why this rating
This daycare earned 4 out of 5 stars overall. Process quality reflects a Kentucky ALL STARS rating of Level 5 (out of 5). Structural quality reflects Kentucky's licensing baseline. Kentucky caps infant ratios at 1:5, toddler ratios at 1:6, and preschool ratios at 1:14. Lead teachers must hold a High School Diploma. Teachers must complete 15 hours of annual training.
Quality Recognitions & Accreditations
- State Quality Rating
- Kentucky ALL STARS Level 5 (Max 5) Learn more →
- Accreditations
- National Association for the Education of Young Children (NAEYC)Not Accredited
- National Accreditation Commission (NAC)Not Accredited
- National Early Childhood Program Accreditation (NECPA)Not Accredited
- National Association for Family Child Care (NAFCC)Not Accredited
Facility Info
- Facility type
- Daycare
- Age groups served
- Not Available
- Licensed capacity
- Not Available
- Teacher-child ratios & group sizesState Minimum Displayed
Age Max ratio Max group Infants 1:5 10 Toddlers 1:6 12 Preschool 1:14 28
Teacher Credentials
- Lead teacher credentialState Minimum Displayed
- High School Diploma
Inspection History
Across 2 inspections since 2024, the issues cited most often were Infectious Disease Prevention & Control (2), Licensing & Administrative Compliance (2), and Medication Administration (1). None of the 5 findings were critical.
See All 2 Inspection Visits
Jan 28, 20251 Finding1 Important
- TB Verification405
922 KAR 2:090. Section 11. Staff Requirements. (1) Child-care center staff: (b) Shall provide, prior to employment and every two (2) years thereafter: 1. A statement from a health professional that the individual is free of active tuberculosis; or 2. A copy of negative tuberculin results. Findings: General: Based on a review of documentation, a copy of negative tuberculin (TB) test results or a statement from a healthcare professional verifying that a staff member DOH: 10/11/10) was free from ac
Apr 11, 20244 Findings4 Important
- Plan of Correction/15 Days195
922 KAR 2:090. Section 15. Statement of Deficiency and Corrective Action Plans. (2) Except for a violation posing an immediate threat as handled in accordance with KRS 199.896(5)(c), a child-care center shall submit a written corrective action plan to the cabinet or its designee within fifteen (15) calendar days of the date of the statement of deficiency to eliminate or correct the regulatory violation. Findings: A PLAN OF CORRECTION WAS DUE ON 05/21/2024 AND AS OF 05/29/2024, THE PLAN OF CORREC
- Educational Requirements400
922 KAR 2:090. Section 11. Staff Requirements. (1) Child-care center staff: (a) Hired after January 1, 2009, who have supervisory power over a minor and are not enrolled in secondary education, shall have a: 1. High school diploma: 2. GED or qualifying documentation from a comparable educational entity; or 3. Commonwealth Child Care Credential as described in 922 KAR 2:250; Findings: General: Based on review of documentation, education credentials for a staff member (DOH 01/08/24) were not prese
- TB Verification405
922 KAR 2:090. Section 11. Staff Requirements. (1) Child-care center staff: (b) Shall provide, prior to employment and every two (2) years thereafter: 1. A statement from a health professional that the individual is free of active tuberculosis; or 2. A copy of negative tuberculin results. Findings: General: Based on review of documentation, the results of a negative tuberculin (TB) test or a statement from a healthcare professional verifying that a staff member (DOH 03/04/24) was free from activ
- Floors, Walls, Ceilings625
922 KAR 2:120. Section 4. Premises Requirements. (9) Floors, walls, and ceilings shall be smooth, in good repair, and constructed to be easily cleaned. Findings: General: Based on observation, one ceiling tile in the Big Owls (Room 108) classroom was stained with a yellowish-brown spot, indicative of water damage. Hygienic Practices In Compliance First Aid/Medication In Compliance Outdoor Play Area In Compliance Equipment In Compliance Transportation In Compliance Kitchen Requirements In Complia