Hoke / McNeal Academy of Higher Learning
Data last updated · May 2026
Quality Indicators
See Methodology →- Overall QualityCombines daily care quality (interactions, learning, environment) with structural features like staff-to-child ratios and teacher qualifications.2 / 5
- Process QualityThe quality of daily care — caregiver-child interactions, learning activities, and the emotional climate. Drawn from the state QRIS rating, accreditations, and Head Start CLASS observations.3 / 5
- Structural QualityMeasurable features like staff-to-child ratios, group sizes, license status, and teacher qualifications. Provider-level data when available; otherwise the state regulatory baseline.2 / 5
Why this rating
This daycare earned 2 out of 5 stars overall. Process quality reflects a Quality Rated rating of Level 2. Structural quality reflects Georgia's licensing baseline. Georgia caps infant ratios at 1:6, toddler ratios at 1:8, and preschool ratios at 1:18. Lead teachers must hold a Child Development Associate (CDA). Teachers must complete 10 hours of annual training.
Quality Recognitions & Accreditations
- State Quality Rating
- Quality Rated Level 2 (Max 3) Learn more →
- Accreditations
- National Association for the Education of Young Children (NAEYC)Not Accredited
- National Accreditation Commission (NAC)Not Accredited
- National Early Childhood Program Accreditation (NECPA)Not Accredited
- National Association for Family Child Care (NAFCC)Not Accredited
Facility Info
- Facility type
- Child Care Center
- Age groups served
- Preschool, School-Age
- Licensed capacity
- 12
- Teacher-child ratios & group sizesState Minimum Displayed
Age Max ratio Max group Preschool 1:18 36
Teacher Credentials
- Lead teacher credentialState Minimum Displayed
- Child Development Associate (CDA)
Inspection History
Across 3 inspections since 2024, the issues cited most often were Staff Qualifications & Background Checks (2), Emergency Preparedness & Drills (1), and Hazardous Materials Handling (1). None of the 4 findings were critical.
See All 3 Inspection Visits
Oct 15, 20252 Findings2 Important
- 591-1-1-.09(1)(a) Requires That a Center Ensure That Every Actual and Potential Director591-1-1-.09
591-1-1-.09(1)(a) requires that a Center ensure that every actual and potential Director, Employee and Provisional Employee of a Child Care Learning Center submit both a Records Check Application to the Department and Fingerprints to an authorized fingerprinting site. It was determined based on a review of records that Staff # 1 hired September of 2025, did not submit both a Records Check Applicat
- 591-1-1-.21(3) Requires That the Center Conduct Drills for Fire, Tornado and Other Emergency Situations591-1-1-.21
591-1-1-.21(3) requires that the Center conduct drills for fire, tornado and other emergency situations. The fire drills will be conducted monthly and tornado and other emergency situation drills will be conducted every six months. The Center shall maintain documentation of the dates and times of these drills for two years. It was determined based on a review of records that the emergency drill fo
Nov 6, 20241 Finding1 Important
- 591-1-1-.33(4) Requires Within the First Year of Employment591-1-1-.33
591-1-1-.33(4) requires within the first year of employment, the Director and person with primary responsibility for food preparation shall have four clock hours of training in food nutrition planning, preparation, serving, proper dish washing and food storage. It was determined based on a review of records that the Director did not have evidence of the four clock hours of training in food nutriti
Sep 10, 20241 Finding1 Important
- 591-1-1-.25(12) - The Consultant Discussed with the Director That Heating and Cooling Equipment Must Be Protected To…591-1-1-.25
591-1-1-.25(12) - The Consultant discussed with the Director that heating and cooling equipment must be protected to prevent children from touching it. Fans, space heaters, etc. shall be positioned or installed so as to be inaccessible to the children.