Skip to main content
Childery

Archway Academy #6

Data last updated · May 2026

Quality Indicators

See Methodology →
  • Overall Quality
    2 / 5
  • Process Quality
    2 / 5
  • Structural Quality
    2 / 5

Why this rating

This daycare earned 2 out of 5 stars overall. Process quality reflects a ABC Quality rating of C. Structural quality reflects South Carolina's licensing baseline. South Carolina caps infant ratios at 1:5, toddler ratios at 1:6, and preschool ratios at 1:17. Lead teachers must hold a High School Diploma. Teachers must complete 15 hours of annual training.

Quality Recognitions & Accreditations

State Quality Rating
ABC Quality C (1 out of Max 5) Learn more →
Accreditations
  • National Association for the Education of Young Children (NAEYC)Not Accredited
  • National Accreditation Commission (NAC)Not Accredited
  • National Early Childhood Program Accreditation (NECPA)Not Accredited
  • National Association for Family Child Care (NAFCC)Not Accredited

Facility Info

Facility type
Child Care Center
Age groups served
Not Available
Licensed capacity
174
Teacher-child ratios & group sizesState Minimum Displayed
AgeMax ratioMax group
Infants1:5Not Regulated
Toddlers1:6Not Regulated
Preschool1:17Not Regulated

Teacher Credentials

Lead teacher credentialState Minimum Displayed
High School Diploma

Inspection History

1 Inspection Visit Since 2025 · 3 Findings
Most recent: Oct 2, 2025Download Latest Report (PDF)
3 Important

Across 1 inspection since 2025, the issues cited most often were Building & Premises Safety (3). None of the 3 findings were critical.

See the Inspection Visit
  1. Oct 2, 20253 Findings3 Important
    • Ceiling Free From Hazards (Water Damage in 3k/4k Bathroom)114-507A(5)(d)

      In the 3k/4k classroom bathroom the ceiling tiles appear to have water damage. Facility will need to verify there is not a leak and replace tiles. Expected correction by 10/09/2025.

    • Walls Free From Hazards (Chips/non-washable Surface in Afterschool Bathroom)114-507A(5)(d)

      In the afterschool bathroom the wall has chips and is not a smooth, washable surface. Director will have wall repaired. Expected correction by 10/09/2025.

    • Baseboard Unattached in Afterschool Classroom114-507A(5)(d)

      In the afterschool classroom the baseboard has unattached from the wall. Director will remove or reattach baseboard. Expected correction by 10/03/2025.