Skip to main content
Childery

Little Learners Academy

Data last updated · May 2026

Quality Indicators

See Methodology →
  • Overall Quality
    3 / 5
  • Process Quality
    Not Available
  • Structural Quality
    3 / 5

Why this rating

This daycare earned 3 out of 5 stars overall. Structural quality reflects Texas's licensing baseline. Texas caps infant ratios at 1:4, toddler ratios at 1:9, and preschool ratios at 1:18. Lead teachers must hold a High School Diploma. Teachers must complete 24 hours of annual training. No objective process measures (e.g., state quality rating or national accreditation) are available for this daycare. The overall rating reflects structural features only.

Quality Recognitions & Accreditations

Accreditations
  • National Association for the Education of Young Children (NAEYC)Not Accredited
  • National Accreditation Commission (NAC)Not Accredited
  • National Early Childhood Program Accreditation (NECPA)Not Accredited
  • National Association for Family Child Care (NAFCC)Not Accredited

Facility Info

Facility type
Child Care Center
Age groups served
Not Available
Licensed capacity
42
Teacher-child ratios & group sizesState Minimum Displayed
AgeMax ratioMax group
Infants1:410
Toddlers1:918
Preschool1:1835

Teacher Credentials

Lead teacher credentialState Minimum Displayed
High School Diploma

Inspection History

4 Inspection Visits Since 2025 · 5 Findings
3 Critical2 Important

Across 4 inspections since 2025, the issues cited most often were Staff-to-Child Ratios & Group Size (1), Staff Qualifications & Background Checks (1), and Children's Records & Files (1). Of 5 total findings, 3 were critical.

See All 4 Inspection Visits
  1. Apr 16, 20262 Findings1 Critical1 Important
    • Supervision Ensures Each Child?s Safety, Well-being, Including Physical Proximity and Auditory or Visual Awareness of Each Child?s on Going Activity746.1205(a)(4)
    • Caregiver Qualification Age Exemption Attends High School - Not in Charge of Group746.1109(b)(1)
  2. Apr 13, 20261 Finding1 Important
    • Required Personnel Records- Meets Requirements746.901(2)
  3. Apr 9, 20261 Finding1 Critical
    • Sign-in and Sign-out Tracking System746.631(a)
  4. Oct 27, 20251 Finding1 Critical
    • Annual Fire Inspection - Before Initial Permit Issued and Every 12 Months746.5101(a)