Skip to main content
Childery

Shenandoah Early Education Center

8861 BEVERLYWOOD ST., LOS ANGELES, CA 90034Childery Rating: 4/5

Data last updated ·

Quality Indicators

See Methodology →
  • Overall Quality
    4 / 5
  • Process Quality
    Not Available
  • Structural Quality
    4 / 5

Why this rating

This daycare earned 4 out of 5 stars overall. Structural quality reflects an 80% violation rate and a license in good standing. The structural rating also includes California's licensing baseline — what every licensed daycare in the state must meet. California caps infant ratios at 1:4, toddler ratios at 1:6, and preschool ratios at 1:12. Lead teachers must hold a High School Diploma. Annual training isn't required by the state. No objective process measures (e.g., state quality rating or national accreditation) are available for this daycare. The overall rating reflects structural features only.

Quality Recognitions & Accreditations

Accreditations
  • National Association for the Education of Young Children (NAEYC)Not Accredited
  • National Accreditation Commission (NAC)Not Accredited
  • National Early Childhood Program Accreditation (NECPA)Not Accredited
  • National Association for Family Child Care (NAFCC)Not Accredited

Facility Info

Facility type
Child Care Center
Age groups served
Not Available
Licensed capacity
115
Teacher-child ratios & group sizesState Minimum Displayed
AgeMax ratioMax group
Infants1:4Not Regulated
Toddlers1:612
Preschool1:12Not Regulated

Teacher Credentials

Lead teacher credentialState Minimum Displayed
High School Diploma

Inspection History

3 Inspection Visits Since 2023 · 3 Findings
3 Important

Across 3 inspections since 2023, the issues cited most often were Staff Qualifications & Background Checks (2) and Building & Premises Safety (1). None of the 3 findings were critical.

See All 3 Inspection Visits
  1. Apr 3, 20261 Finding1 Important
    • 01229 Responsibility for Providing Care and Supervision (A) The Licensee Shall Provide Care and supervision...(1)No Child(ren) Shall Be Left Without the Supervision of a Teacher…CCR 101229(a)

      (POC) due date, may result in a civil penalty assessment. Loyce Phillips NAME OF LICENSING PROGRAM MANAGER: Brittany Lovest NAME OF LICENSING PROGRAM ANALYST: LICENSING PROGRAM ANALYST SIGNATURE: DATE: 04/03/2026 I acknowledge receipt of this form and understand my appeal rights as explained and received. FACILITY REPRESENTATIVE SIGNATURE: DATE: 04/03/2026 LIC809 (FAS) - (06/04) Page: 3 of 3

  2. Jan 15, 20251 Finding1 Important
    • 01238.2 (d)(1)(2) Outdoor Activity Space (d)The Surface of the Outdoor Activity Space Shall Be Maintained: (1)In a Safe Condition for the Activities Planned. (2) Free of Hazards…CCR 101238.2(d)(1)(2)

      (POC) due date, may result in a civil penalty assessment.

  3. Aug 8, 20231 Finding1 Important
    • The Licensee Shall Provide Care and Supervision as Necessary to Meet the Children's Needs... Supervision Shall Include Visual Observation. This Requirement Was Not Met As…CCR 101229(a)(1)

      (POC) due date, may result in a civil penalty assessment.

Explore More

Daycares Near This One