Skip to main content
Childery

Watch Me Grow Daycare Norwalk

Data last updated · May 2026

Quality Indicators

See Methodology →
  • Overall Quality
    3 / 5
  • Process Quality
    Not Available
  • Structural Quality
    3 / 5

Why this rating

This daycare earned 3 out of 5 stars overall. Structural quality reflects a 243% violation rate across 7 visits in the last 3 years (most recently inspected July 2025) and a license in good standing. The structural rating also includes Connecticut's licensing baseline — what every licensed daycare in the state must meet. Connecticut caps infant ratios at 1:4, toddler ratios at 1:4, and preschool ratios at 1:10. Lead teachers must hold a High School Diploma. No objective process measures (e.g., state quality rating or national accreditation) are available for this daycare. The overall rating reflects structural features only.

Quality Recognitions & Accreditations

Accreditations
  • National Association for the Education of Young Children (NAEYC)Not Accredited
  • National Accreditation Commission (NAC)Not Accredited
  • National Early Childhood Program Accreditation (NECPA)Not Accredited
  • National Association for Family Child Care (NAFCC)Not Accredited

Facility Info

Facility type
Child Care Center
Age groups served
Not Available
Licensed capacity
63
Teacher-child ratios & group sizesState Minimum Displayed
AgeMax ratioMax group
Infants1:48
Toddlers1:48
Preschool1:1020

Teacher Credentials

Lead teacher credentialState Minimum Displayed
High School Diploma

Inspection History

1 Inspection Visit Since 2025 · 5 Findings
5 Important

Across 1 inspection since 2025, the issues cited most often were Safe Sleep & SIDS Prevention (3), Children's Records & Files (1), and Building & Premises Safety (1). None of the 5 findings were critical.

See the Inspection Visit
  1. May 30, 20255 Findings5 Important
    • 128- Diapering19a-79-10(e)(1-10)
    • 130- Safe Sleep19a-79-10(g)(1-8)
    • 136- Feeding19a-79-10(j)-(k)(1-5)
    • 041- Injury, Illness, Incident, Accident Reports19a-79-5a(a)(3)(A)
    • 070- Lead Paint- Testing, Management Plans19a-79-7a(c)(6)(A-D)